STATUS / SCHEDULES

  

Group No. Street name Limits Miles Type of improvement Estimated construction cost Project status
18 Forstall (Douglass St. - N. Claiborne) 0.8 Resurfacing, pavement patching, repairing curbs if existing, installing ADA compliant accessible ramps. $2.4M Construction set to begin July 2012
Tupelo Street (Douglass Street - St. Claude Ave.) 0.4
Alvar (Higgins - Florida) 0.8
Alvar (Chef Menteur - Higgins) 0.8
19 Hayne (Press - Congress) 0.4 Resurfacing, pavement patching, repairing curbs if existing, installing ADA compliant accessible ramps. $2.4M Construction set to begin July 2012
Morrison (Lamb - Mayo) 0.8
Mayo (Hayne - Morrison) 0.5
Mayo (Morrison - I-10) 0.3
20 St. Bernard (N. Rampart - Sere) 1.9 Resurfacing, pavement patching, repairing curbs if existing, installing ADA compliant accessible ramps. $6.4M Construction set to begin June 2013
Gentilly Blvd. (Paris - Broad) 0.9
21 Robert E. Lee (Elysian Fields - Franklin) 0.5 Resurfacing, pavement patching, repairing curbs if existing, installing ADA compliant accessible ramps. $3.5M Construction set to begin January 2013
Franklin (Filmore - Gentilly) 0.7
Filmore (West End - Canal) 0.4
Filmore (Marconi - Wisner) 0.7
22 Basin (Canal Street - N. Claiborne) 0.7 Resurfacing, pavement patching, repairing curbs if existing, installing ADA compliant accessible ramps. $4.6M Construction set to begin April 2014
Rampart (Iberville - Esplanade) 0.8
Rampart (Esplanade - Elysian Fields)* 0.5 *The boulevard roadway N Rampart from Esplande to St. Bernard, McShane Place from St. Bernard to Pauger, St. Claude from Pauger to Elysian Fields
23 Freret (Louisiana - Jefferson) 1 Resurfacing, pavement patching, repairing curbs if existing, installing ADA compliant accessible ramps. $3.1M Construction set to begin September 2013
Nashville (S. Claiborne - Fountainbleau) 0.6
Nashville (S. Claiborne - Fountainbleau) 0.6
Fountainbleau (Broadway - Nashville) 0.3
24 Leonidas (Palmetto - Earhart) 0.5 Resurfacing, pavement patching, repairing curbs if existing, installing ADA compliant accessible ramps. $3.5M Construction set to begin February 2013
Broadway (Fountainbleau - Leake) 2.1
25 Jefferson Davis (Gravier - Canal) 0.5 Resurfacing, pavement patching, repairing curbs if existing, installing ADA compliant accessible ramps. $2.9M Construction set to begin March 2014
Banks (Carrolton - St. Patrick) 0.4
Bienville (Jefferson Davis - Carrolton)(Half Sect.) 0.5
Bienville (Jefferson Davis - Carrolton)(Half Sect.) 0.5
26 City Park Avenue (Canal - Orleans) 0.6 Resurfacing, pavement patching, repairing curbs if existing, installing ADA compliant accessible ramps. $4.3M Construction set to begin December 2012
Esplanade (Moss Street - N. Claiborne) 1.5
27 Clearview (Veterans - Kawanee) 0.3 Resurfacing, pavement patching, repairing curbs if existing, installing ADA compliant accessible ramps. $1.1M Construction set to begin August 2013
28 Burgundy Street (Canal - Esplanade) 0.9 Resurfacing, repairing concrete curbs, resetting stone curbs, installing ADA compliant ramps and repairing and replacing damaged/failed sidewalks. $4.9M Construction set to begin July 2012
Dauphine Street (Canal - Esplanade) 0.9
Esplanade Ave. (N. Rampart - N. Peters) 0.7
Toulouse Street (N. Rampart - Decatur) 0.14
Saint Louis Street (N. Rampart - Decatur) 0.14
29 Decatur Street (St. Louis - Dumaine) 0.3 Resurfacing, repairing concrete curbs, resetting stone curbs, installing ADA compliant ramps and repairing and replacing damaged/failed sidewalks. $4.1M Construction set to begin July 2012
N. Peters (Canal - St. Louis) 0.26
Royal Street (Canal - Esplanade) 0.9
Toulouse Street (Dauphine - Decatur) 0.28
Saint Louis Street (Dauphine - Decatur) 0.28
30 Loyola Drive (3 Loyola's to W. Esplanade) 0.32 Resurfacing, pavement patching, repairing curbs if existing, installing ADA compliant accessible ramps. $6.3M Construction set to begin March 2014
31st Street (Duncan Canal to Phoenix St.) 0.58
31st Street (Phoenix St. to Loyola Drive) 0.58
W. Esplanade (Williams to Colorado) 0.4
W. Esplanade (Ole Miss St. to Duncan Canal) 1.2
Intersection (Loyola Dr. and W. Esplanade) Intersection
31 Sal Lentini (Joe Yenni Blvd to Vintage) 0.57 Resurfacing, pavement patching, repairing curbs if existing, installing ADA compliant accessible ramps. $6M Construction set to begin August 2013
Chateau Blvd. (Vintage to Chateau Dulac) 0.42
Joe Yenni (Williams Blvd to Duncan Canal) 0.53
Joe Yenni (Rhine Dr. to Sal Lentini) 0.44
Joe Yenni (Duncan Canal to Roystonea Dr.) 0.42
Joe Yenni (Roystonea Dr. to Rhine Drive) 0.44
32 Intersection (Vintage Dr. and Loyola Dr.) Intersection Resurfacing, pavement patching, repairing curbs if existing, installing ADA compliant accessible ramps. $6.7M Construction set to begin February 2013
Vintage Dr. (Duncan Canal to Chateau Blvd EB) 0.52
Vintage Dr. (Duncan Canal to Chateau Blvd WB) 0.52
Vintage Dr. (Chateau Blvd. to Loyola Dr) 0.79
Loyola Drive (Vintage to W. Esplanade) 0.77
33 Williams Blvd. (Airline to 3rd Street) 0.43 Resurfacing, pavement patching, repairing curbs if existing, installing ADA compliant accessible ramps. $5.8M Construction set to begin November 2013
W. Metairie Ave. (Williams to City Limit) 0.45
Roosevelt (Airline Dr. to W. Metairie) 0.63
Roosevelt (W. Metairie to Veterans) 1.17
34 Congress (Hayne - Madrid) 0.5 Resurfacing, pavement patching, repairing curbs if existing, installing ADA compliant accessible ramps. $2M TBD
Congress (Madrid - Chef Mentur) 1.1